Construction Defects Evaluation Basic Fact PatternDefendant had installed an asphalt shingle roof and performed pest remediation services on the dwellingThe residence had severe damage to its exterior envelopeAlleged damages to the residence were the result of poor workmanship of the defendant Investigative Steps TakenDwelling was visually inspectedUnmanned Aerial Vehicle employed to document areas unsafe for human beingsComprehensive study of building history was performedDetailed code and product analysis was performedIn-depth analysis of opposing repair estimate made Determinations MadeThe roofing material was not installed properly and would require replacementThe extensive damages to the exterior envelope were historic in nature and not the result of defendant’s faulty workmanshipLitigation support services were also provided throughout the mediation process Involved Experts: Benjamin Irwin, P.E., DFEThom Freeman, RA, LEED APChristopher DeSantis, RA LEED APNicholas Morris, Construction Consultant